
The Hosur Plant adopts Delta’s SCARA robot for automated optical inspection to achieve production automation and enhance product quality

The Hosur Plant adopts the same MES system as in the Taoyuan Plant and Wujiang Plant for coordinated and globalized management

The Hosur Plant manufactures its first variable frequency drive during a trial production in March

Delta Hosur Plant receives the certificate for mass production of variable frequency drives

On the opening day, Wujiang HPC Plant Manager Mr. Paul Lin (first left) gives an introduction tour to the VIPs in the Hosur Plant

IABG General Manager Mr. Simon Chang (left) and President of Delta Electronics (Thailand) PCL Mr. Dick Hsieh (right) perform India’s traditional candle lighting ceremony to pray for blessings and good fortune for the Hosur Plant

On April 8th, Delta held the opening ceremony with ribbon cutting by IABG General Manager Mr. Simon Chang (left), President of Delta Electronics (Thailand) PCL Mr. Dick Hsieh (central), and Managing Director of Delta Energy Systems (India) Mr. Dalip Sharma (right)